
1. Precautions: (1) Manually vent and drain the air storage tank before starting the machine every day; (2) After starting the cold dryer for 3 minutes → starting the compressor until the pressure in the pipeline is greater than 0.5MPa → starting the adsorption dryer; (3) When shutting down, it is necessary to ensure that […]